Home >

A Brief Introduction To The Asian Games Village Of The 2010 Guangzhou Asian Games

2010/10/6 14:56:00 239

2010 Guangzhou Asian Games


2010 guangzhou asian games Athletes' Village


Guangzhou Asian Games athletes village high cost, after the competition will become commercial housing.


be located Guangzhou New Town The main project of the Asian Games Village (media village, athletes village, technical officials Village) will be started in May 2008 and completed in March 2010. The total land use of the Asian Games Village is 110.9 hectares, with a total investment of more than 4.1 billion yuan.


In the relevant survey and design bidding announcement issued on October 8, 2007, the athletes' village has become the "champion" in the four bid sections with three "firsts" of 55.2 hectares of land, a total construction area of 548000 square meters and a total investment of 1.8 billion yuan. Although the investment is high, the athletes' village will be sold as a commercial housing district after the Asian Games. Therefore, the government's investment will become "laying golden rooster".


The total project investment of the four sections is about 4.15 billion yuan, of which the construction and installation cost is about 3.52 billion yuan. All the investment will be coordinated by the municipal finance. The project is expected to start in May 2008 and complete in March 2010. The design reasonable service life of the whole project is 50 years.


In order to ensure the quality of the project, the bidding documents determine the strict screening conditions. The applicant must have class a qualification for construction engineering design and class a qualification for comprehensive engineering survey. It is required to strictly control the investment and put an end to the "fishing project" with low budget and high investment. In the bidding stage, all economic and technical indicators, including the unit cost and building area, shall not exceed the corresponding indicators in the "Guangzhou Asian Games Village constructive detailed planning". In the design stage, the total investment and construction and installation costs of relevant projects cannot be exceeded. The engineering design fee is guided by the government.


The preliminary design period is as follows: the construction drawing design shall be completed and passed the review before May 15, 2008, and the specific design period of each stage shall be stipulated in the contract; The whole construction process requires cooperation with on-site service (the specific time of site stay shall be subject to the requirements of the owner). If the construction period is delayed, it will be carried out in strict accordance with the contract conditions.


Among them, Guangzhou Asian Games City Athletes' Village There are 74 apartment buildings with 7398 households and 16870 rooms in the village. During the games, about 14700 athletes, team officials and more than 7000 registered media staff will be provided with accommodation services during the games.

  • Related reading

Objectives, Ideas And Objectives Of The 2010 Asian Games In Guangzhou

Local hotspot
|
2010/10/6 14:50:00
60

Asian Games Mascot Sports Icon And Design Interpretation

Local hotspot
|
2010/10/6 14:47:00
163

Events And Venues For The 2010 Asian Games In Guangzhou

Local hotspot
|
2010/10/6 14:45:00
60

Mascot Of 2010 Guangzhou Asian Games

Local hotspot
|
2010/10/6 14:44:00
53

2010 Guangzhou Asian Games Emblem And Concept

Local hotspot
|
2010/10/6 14:37:00
144
Read the next article

"Leather Capital" Hebei Xinji Pformation Mechanism To Create The Two Largest Chinese Asia

Leather City, Xinji, Hebei, has become the largest production base of sheepskin garments and the largest leather sheepskin base in Asia. It was learned by reporters at the eighteenth China (Xinji) Leather Fair, which just closed on the eve of national day.